Built-up System, Darley Dale

Built-up System, Darley Dale

In another collaboration with Midland Structures Ltd, SJS Sheeting were the chosen roofing and cladding contractor to design and build the roofing and cladding to this control room on a project with stringent health and safety requirements.

TATA Built-Up System was the material supplied and installed on this project and completed in 2 weeks.

What

Materials Did We Use?

Roofing Material

Roof liner – Tata RL32-1000, 0.7mm, bright white.

Roof outer sheet – Tat R32-1000, 0.7mm, HPS200 finish, RAL 7016 Anthracite Grey.

140mm Gridtite brackets.

3 metre Gridtite bars.

Superglass Clad Mat 040 – 140mm.

Wall Material

Wall liner – Tata CL19-1000, 0.4mm, bright white.

Wall outer sheet – Tata C32-1000, 0.5mm, Prisma finish, RAL 7016 Anthracite Grey.

140mm Gridtite brackets.

3 metre Gridtite bars.

Superglass Clad Mat 040 – 140mm.

eBook Cover

    Download Our

    Free Brochure

    Please enter your name and email to access our company eBrochure.

    Please view our Privacy Policy for more information on how we use your data.