Approximately 1,200 m² of ACM was removed and disposed of correctly by our hazardous waste specialists, and new bespoke composite roof panels and insulated membrane valley gutters were installed within 8 weeks.
This project was a live building. Within the programme, SJS Sheeting Ltd worked proactively alongside the building owner to minimise disruption to the business. To assist in this, we factored in working weekends and during holiday shutdowns, all while maintaining the safety of our team and the existing business team as a priority, ensuring exclusion zones were maintained.
The works on this project were completed in early September 2022. If you have any similar issues, enquire below for a FREE QUOTE.
What
Materials Did We Use?
Roof
100mm Tata Trisomet 333 goosewing grey LG composite panel.
Rooflight
100mm Trisomet 333 FAIRS to suit by Brett Martin.
Wall area
Existing walls were ACM, these were removed and disposed of along with all other ACM materials from the project.
We replaced approx. 200m2 with an 80mm Tata Trisomet 333 goosewing Grey LG composite panel.