SJS Sheeting Limited were contracted for the supply and installation of roofing and wall cladding to a new build project in Birmingham.

This project had hips and valleys which were required to be GRP weathered. Roof comprised of JORIS IDE composite panel 435m2, with Brett Martin Factory Assembled rooflights to the workshop area. This was fully loaded by and installed in 2 working days.

Walls comprised of 154m2 of JORIS IDE composite panel and was installed complete with flashings and gutters in 2.5 weeks.

Total time on site inclusive of GRP Weathering to valleys: 2.5 weeks.

What

Materials Did We Use?

  • Joriside composite panel roof and walls.
  • Rooflights to office area, by Brett Martin.
  • GRP weathering to valley hips.

Due to the ongoing disruption in the supply chain; SJS Sheeting assisted the Main Contractor and client in securing agreeable alternatives to ensure programme requirements were met.

Roof Area

435m^2 Loaded and installed in 2 working days

Wall Area

154m^2 2 weeks of installation time to complete all panels and ancillaries.